Status 2011 01 23

Site status:

  • Lidar: running
  • Dial: warming up
  • Cloudradar KATRIN: running
  • Ceilometer : running
  • MRR-CIMH: running
  • MRR-Deebles: running
  • Raingauge: running
  • Cloudcam: running
  • WeatherSensor: running

The Ceilometer is modified back to normal type, I hope I renewed all parameters. The dial is making progress, the Cloudradar is scanning again (with AC working quiet satisfying).

This entry was posted in Uncategorized. Bookmark the permalink.

One Response to Status 2011 01 23

Leave a Reply