Status 2011 01 21

Site status:

  • Lidar: running
  • Dial: down
  • Cloudradar MPI: running
  • Cloudradar KIT: packed !
  • Ceilometer EXT: running
  • Ceilometer KIT: packed!
  • MRR-CIMH: running
  • MRR-Deebles: running
  • Raingauge: running
  • Cloudcam: running
  • WeatherSensor: running

The container with KIT Radar is ready to be shipped. We now have to arrange the earliest possible vessel…

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply