Status 2010 12 05

Another roof day, we fixed two more edges of the Raman Container. Stupid enough we choosed the maximum sunlight for this work…

The status of our systems at the site:

  • Lidar: running
  • Cloudradar: running
  • Ceilometer: running
  • Ceilometer KIT: running
  • MRR-CIMH: running
  • MRR-Deebles: running
  • Raingauge: running
  • Cloudcam: running
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply