Status 2010 12 04

Today was roof day, we fixed one edge of the Raman Container and the second window of the container.

The status of the systems at the site:

  • Lidar: running
  • Cloudradar: running
  • Ceilometer: running
  • Ceilometer KIT: running
  • MRR-CIMH: running
  • MRR-Deebles: running
  • Raingauge: running
  • Cloudcam: running

Indeed it looks like roof days! Whenever I take a look, you are on top of the containers….


This entry was posted in Uncategorized. Bookmark the permalink.

One Response to Status 2010 12 04

Leave a Reply