Update 2020 12 08

Marvin managed to exchange the UPS today, so most of the systems are back!
* RamanLidar CORAL: running
* CloudRadar CORAL: stopped, waiting for new UPS
* Windlidar2: running
* MRR-CIMH: running
* MRR-BCO: running
* Ceilometer CHM: stopped
* Radiation: running, no longwave
* Weathersensor: running
* Disdrometer: stopped

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply