Status 2020 12 07

The power is back to the site, but we have a damage central UPS in the office container. This UPS need to be replaced before we can restart all
site instruments.

* RamanLidar CORAL: stopped
* CloudRadar CORAL: stopped
* WindLidar2: stopped
* MRR-CIMH: running
* MRR-BCO: stopped
* Ceilometer CHM: stopped
* Radiation: stopped
* Weathersensor: stopped
* Disdrometer: stopped

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply