Status 2010 12 24

Site status:

  • Lidar: running
  • Dial: down
  • Cloudradar MPI: test measurements
  • Cloudradar KIT: test measurements
  • Ceilometer: running
  • Ceilometer KIT: running
  • MRR-CIMH: running, no data transfer
  • MRR-Deebles: running
  • Raingauge: running
  • Cloudcam: running
  • WeatherSensor: running

We had a  lot of rain at the site, our basin is filled completely and there was some flooding between the containers. Hopefully we are safe on the cementum blocks…

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply