Status 2010 12 08

Container are expected to arrive at port today…

The status of our systems at the site:

  • Lidar: running
  • Cloudradar: running till approx. 10 local, after that the tested the mobility of the trailer, radar wheels are still turning!
  • Ceilometer: running
  • Ceilometer KIT: running
  • MRR-CIMH: running
  • MRR-Deebles: running
  • Raingauge: running
  • Cloudcam: running

look at the nice clouds .. and the nice guys working at the trailer….

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply