Status 2016 05 03

Together with Marvins helping hands we were able to repower the site. For tests we stopped units outside and plan to switch them back during the next days.
* Lidar: was up and running, but due to missing MRR-Signal the hatch was closed during the powerdrop
* CloudRadar KATRIN: stopped
* CloudRadar CORAL: stopped, still temperature problems
* WindLidar: running (stare mode), cleaned
* SUNHAT: stopped and unplugged
* MRR-CIMH: running
* MRR-BCO: started
* Ceilometer CHM: stopped and unpowered
* Radiation: stopped and unpowered
* Weathersensor: started
* Cloudcam: stopped and unpowered

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply