Status 2014 01 14

BL&P repaired the power lines, so this should last for some time. After restarting the site the AC for the Raman skipped work.
* Lidar: stopped, laser head problems, AC stopped
* Cloudradar KATRIN: stopped, power problems
* SUNHAT: stopped
* MRR-CIMH: stopped
* MRR-Deebles: running
* Ceilometer CHM: running
* Weathersensor: running (thanks to Hauke!)
* Cloudcam: running

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply