Status 2013 10 08

* Lidar: running, second Laser installed
* Cloudradar KATRIN: running with cone cover
* MRR-CIMH: running
* MRR-Deebles: running
* Ceilometer CHM: running
* Cloudcam: running
* Weathersensor: running

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply