Status 2012 12 27

* Lidar: running
* Cloudradar KATRIN: running
* MRR-CIMH: running
* MRR-Deebles: running
* Ceilometer CHM: running (data transfer to be checked)
* Cloudcam: running
* Weathersensor: running

* DIAL: pumping stopped (flash lamp at 60mil. shots); low EOM transmission -> instrument will be stopped completely

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply