Status 2012 11 13

* Lidar: warm up, new Network-cable and UPS from the DIAL
* DIAL: stopped
* Cloudradar KATRIN: stopped
* MRR-CIMH: stopped
* MRR-Deebles: running
* Ceilometer CHM: running
* Cloudcam: stopped
* Weathersensor: stopped since 15:40 UTC

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply