Status 2012 08 16

* Lidar: stopped, laser malfunction, hatch closed
* DIAL: up, but hatch closed due to missing MRR control
* Cloudradar KATRIN: running
* MRR-CIMH: running
* MRR-Deebles: stopped, Ceilo-PC down
* Ceilometer CHM: running, Ceilo-PC down
* Cloudcam: stopped
* Weathersensor: stopped, Ceilo-PC down

 

Power drop at 15:21 UTC

Power back at 16:00 UTC

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply