Status 2012 07 04

* Lidar: running, calibration to be checked
* DIAL: running
* Cloudradar KATRIN: stopped , AC failure
* MRR-CIMH: running
* MRR-Deebles: running
* Ceilometer CHM: running
* Cloudcam: running
* WeatherSensor:  running

Thanks to Marvin (!) the Raman lidar is up.
Due to a limited Marvin’s time we did not perform all required tests for the Radar AC,
it is planed to do it later this week.