Status 2010 08 25
Systems at the site:
- Lidar: running
- Cloudradar: scanning and vertically, Lutz stopped Measurements at 15:00 UTC
- Ceilometer: running
- MRR: running
- Raingauge: running
Marvin was at the site and did his work. He had a look at the radar and cleaned the optics. Due to his injury he was not able to install the camera. But he is planning to come back on Friday. After that he will travel to Finnland….
He counted the Flashlamps left in the lidar: 16 lamps means 8 month of operation….

Comments
Status 2010 08 25 — No Comments
HTML tags allowed in your comment: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>