Status 2011 10 28

* Lidar: realigned, running again (new calibration constants to be applied)
* Dial: running
* Cloudradar KATRIN: running
* MRR-CIMH: running
* MRR-Deebles: running
* Raingauge: stopped
* Ceilometer: running
* Cloudcam: running
* WeatherSensor: running

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply