Status 2010 08 09
Systems at the site:
- Lidar: stillnot running, low water level of the laser, Marvin will come today
- Cloudradar: running vertically and scanning
- Ceilometer: running
- MRR: running
- Raingauge: running
Lidar is up and running at 20:35 , but the energy distribution is not optimal.
Marvin will come tomorrow to adjust the crystal.

Comments
Status 2010 08 09 — No Comments
HTML tags allowed in your comment: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>