2022 06 15

Marvin managed to get BL&P to site, the power issue is solved and the clamps for the power lines are renewed. We still do not have access to the site due to a damaged server (the hardware was completely gone), we are working on this problem with available spare parts.

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply