Status 2011 02 13

Site status:

  • Lidar: running, still a lot of not needed rain-signals for the hatch, pending
  • Dial: stabilisation is down, no measurements, pending
  • Cloudradar KATRIN: running and scanning
  • Ceilometer : running
  • MRR-CIMH: running
  • MRR-Deebles: running
  • Raingauge: running
  • Cloudcam: running
  • WeatherSensor: running
Matthias from Metek fixed the computer problems at the radar-computer.
A fantastic cloud coverage yesterday:
and
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply