Status 2011 01 31

Site status:

  • Lidar: running up since 17 UTC, thanks to Marvin
  • Dial: running
  • Cloudradar KATRIN: running and scanning
  • Ceilometer : running
  • MRR-CIMH: running
  • MRR-Deebles: running
  • Raingauge: running
  • Cloudcam: running
  • WeatherSensor: running

Marvin had a short site day and manage to recover the DAQ from Ramanlidar. All optical surfaces are cleaned.

The container with KIT-Wora is already in Port and will leave Bridgetown tomorrow. Just by accident I manage to get some photos from the departure…

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply