* Lidar: stopped, laser problem
* Dial: running
* Cloudradar KATRIN: stopped
* MRR-CIMH: running
* MRR-Deebles: running
* Raingauge: running
* Ceilometer: running
* Cloudcam: running
* WeatherSensor: running
Status 2011 07 12
* Lidar: stopped due to AC problem (site visit is planned for today)
* Dial: running
* Cloudradar KATRIN: stopped
* MRR-CIMH: running
* MRR-Deebles: running
* Raingauge: running
* Ceilometer: running
* Cloudcam: running
* WeatherSensor: running
The results of the site visit: the AC in Raman lidar is running again, thanks to Marvin. The laser in the Raman lidar is OFF, it reports a “power supply unit” problem.
Status 2011 07 11
* Lidar: AC is not running, which caused all other problems
* Dial: set up mode
* Cloudradar KATRIN: stopped
* MRR-CIMH: running
* MRR-Deebles: running
* Raingauge: running
* Ceilometer: running
* Cloudcam: running
* WeatherSensor: running
AC in Raman lidar did not come up after a power drop happened on 10.07.2011 at 13:10 UTC. Site visit is planned for today.
Status 2011 07 10
* Lidar: laser stopped due to “low coolant flow”, “low coolant temperature”, site visit is needed
* Dial: running
* Cloudradar KATRIN: stopped
* MRR-CIMH: running
* MRR-Deebles: running
* Raingauge: running
* Ceilometer: running
* Cloudcam: running
* WeatherSensor: running
Status 2011 07 09
* Lidar: running
* Dial: running
* Cloudradar KATRIN: stopped
* MRR-CIMH: running
* MRR-Deebles: running
* Raingauge: running
* Ceilometer: running
* Cloudcam: running
* WeatherSensor: running
Raman lidar: synchronization issue is solved. Incorrect detector voltage in vibrational nitrogen channel was a reason for wrong numbers of water vapor mixing ratio on 11.07.08. This issue is also fixed now.
Status 2011 07 08
* Lidar: running (synchronization of data clock to be fixed)
* Dial: running
* Cloudradar KATRIN: stopped
* MRR-CIMH: running
* MRR-Deebles: running
* Raingauge: running
* Ceilometer: running
* Cloudcam: running
* WeatherSensor: running
Status 2011 07 07
* Lidar: running (automated data retrieval is not restarted yet)
* Dial: running
* Cloudradar KATRIN: stopped
* MRR-CIMH: running
* MRR-Deebles: running
* Raingauge: running
* Ceilometer: running
* Cloudcam: running
* WeatherSensor: running
Statrus 2011 07 06
Due to transportation issues the site-day is shifted to today.
* Lidar: stopped
* Dial: running
* Cloudradar KATRIN: stopped
* MRR-CIMH: running
* MRR-Deebles: running
* Raingauge: running
* Ceilometer: running
* Cloudcam: running
* WeatherSensor: running
Status 2011 07 05
Today we have a site day and hopefully we will manage to bring the raman back to operation…
* Lidar: stopped
* Dial: running
* Cloudradar KATRIN: stopped
* MRR-CIMH: running
* MRR-Deebles: running
* Raingauge: running
* Ceilometer: running
* Cloudcam: running
* WeatherSensor: running
Status 2011 07 04
* Lidar: stopped
* Dial: running
* Cloudradar KATRIN: stopped
* MRR-CIMH: running
* MRR-Deebles: running
* Raingauge: running
* Ceilometer: running
* Cloudcam: running
* WeatherSensor: running
