2024 07 08

Lime managed to get the fibre line repaired, together with Marvin the site came back…
Most instruments survived, the MRR-Dish could be repaired by Marvin, the WBAND-RADAR stopped after some time, reason unknown. Some instruments were running all the time: Ceilometer, MRR-PRO, Weather Sensors
* RamanLidar CORAL: stopped, laser damaged
* CloudRadar CORAL2: started, waiting for dry waveguides
* CloudRadar RumBa: stopped
* Radiometer BCOHAT1: started
* Windlidar1: started
* MRR-BCO: running, dish fixed
* MRR-PRO-BCO: running
* MRR-CIMH: running
* Ceilometer CHM: running
* Radiation: started
* Weathersensor: running

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply