2024 07 05

Marvin was at the site, BL&P restored the power lines to the site, the fibre internet line is still damaged, hopefully next week this connection can be fixed. I will keep you updated…

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply